Automotive parts & precision engineering
Presses, CNC and gauges under IATF, with the customer approvals, PPAP submissions and gauge calibrations a prime can ask to see at any time.
Ships today as the automotive pack, version 1IATF 16949 · VDA · PPAP
- Document type
- Industry pack
- Document
- ACT-WEB
What the pack gives you on day one.
Presses, CNC and gauges under IATF, with the customer approvals, PPAP submissions and gauge calibrations a prime can ask to see at any time. Everything below is seeded into your organisation when you adopt the pack, and every row of it is yours from that moment: rename it, reorder it, delete it, add to it. Upgrading the pack later never overwrites something you have edited.
Assets you put in the register
- Press
- Stamping and forming presses, including the statutory examination on the guarding and the ram.
- CNC machine
- Turning and machining centres producing dimensioned features.
- Gauge
- Hand and fixture gauges whose calibration decides whether a characteristic can be signed off.
- Coordinate measuring machine
- CMMs and vision systems used for layout and PPAP dimensional results.
- Fixture
- Checking fixtures and holding fixtures, verified on a cycle rather than calibrated.
- Injection moulding
- Moulding machines and the tools they run, where tool life is counted in shots.
- Assembly station
- Torque tools, press-fit stations and poka-yoke sensors whose verification is part of the process.
- Test rig
- Leak, endurance and function rigs producing the results a customer relies on.
Fields your sector needs
Not hardcoded into the product for everyone — defined by the pack, validated on every write, and filterable and exportable like any built-in field.
- Customer programmeText
- The programme or platform this runs for. It is what an audit is scoped by, and what a line-down call names first.
- Characteristic classOne of a list
- The highest class of characteristic this equipment produces or measures. Safety-critical drives the shortest calibration interval.
- Safety-critical · Significant · Standard
- Control plan referenceText
- The control plan this appears in, so an auditor can be handed the document rather than a search.
- Tool life (shots)Whole number
- Rated shots for a tool or die. Recorded for planning; the register still warns on dates, not counts.
Your words, not ours
No screen in the product hardcodes a noun. The pack renames these, and the rest keep the neutral word.
- entitlementApprovals
- maintenance_planMaintenance plans
- service_eventMaintenance records
What expires, and how early you hear about it.
These are the real warning ladders, not an illustration. Each one is set from how long that renewal actually takes — a certificate an authority re-inspects opens months ahead, because a thirty-day reminder would already be too late. The first rung is when the work has to start; a final 1 means it stops work the day it lapses.
| Approval | Why it is on the ladder | Warns at |
|---|---|---|
| IATF 16949 certification | The site's certificate. The certification body books the surveillance audit months ahead, so the first warning is deliberately early. | 2701809030days before |
| PPAP approval | Held per part per customer. A change to the part, the tool or the process restarts it rather than renewing it. | 12090307days before |
| Customer approval | A prime's own supplier or process approval, separate from IATF and usually on its own clock. | 18090307days before |
| Gauge calibration | A lapsed gauge invalidates every measurement taken after the due date, so this warns to the day. | 603071days before |
| MSA study | Gauge R&R on a cycle. Out of date is a finding even where the calibration is current. | 90307days before |
| Fixture verification | Periodic check that a checking fixture still represents the part. | 60307days before |
| Statutory examination | Thorough examination of presses, lifting equipment and pressure systems. | 903071days before |
| Operator qualification | Held by a person. A lapse stops them signing off the operation the same day. | 903071days before |
Held against
Tag an obligation with the standard it satisfies, and the coverage report counts them — including the ones mapped to no framework at all, which is the number an auditor asks about.
- IATF 16949 · IATF
- VDA 6.3 · VDA
- PPAP · AIAG
- ISO 14001 · ISO
Views already drawn
Filters your sector asks for weekly, waiting above the register on the first day. They are ordinary saved views: change the columns, delete the ones you do not want, save your own.
- Safety-critical equipment
- Measurement equipment
- Assembly & test stations
The question the inspection opens on.
“Prove the gauge used for this characteristic was calibrated and capable.”
The auditor export answers it in one action: the asset, every obligation on it, every plan, every service event, every filed document and the full change history — assembled in a single consistent read, so no two sections of the file can disagree. Two exports of an unchanged record are byte-for-byte identical.
Append-only history. Every change lands in an event log in the same transaction as the change. No role holds an update or delete grant on that table.
Certificates listed, with their evidence. Documents filed against the obligations and the service events are in the export too — the calibration certificate lives on the service event, and that is the one you will be asked for.
Readable by everyone on the team. Quality, finance and an external auditor given a seat can all run it. The people who most need the export are exactly the ones a viewer role would have blocked.
The dashboard on any Monday morning: what has already lapsed, what lapses this week, and what needs starting now to land on time.
| Obligation | Asset | Location | Date | Status | Owner |
|---|---|---|---|---|---|
| Sterilisation validation8 Apr | Autoclave AC-114 | Plant 1 · Clean room | 8 Apr | 3d overdue | R. Mensah |
| Storage permit15 Apr | Solvent store SS-02 | Plant 2 · Yard | 15 Apr | in 4d | A. Silva |
| Calibration certificate17 Apr | CMM-07 | Plant 1 · Metrology | 17 Apr | in 6d | J. Park |
| ISO 13485 certificate4 Jul | Organisation-wide | All sites | 4 Jul | open · 84d | Quality |
| Service contract25 Apr | Cold room CR-1 | Plant 2 · Store | 25 Apr | cancel in 14d | Finance |
| Pressure vessel inspection3 Apr | Autoclave AC-114 | Plant 1 · Clean room | 3 Apr | 8d overdue | R. Mensah |
| Radiation source licence12 May | X-ray cabinet XC-3 | Plant 1 · Inspection | 12 May | open · 31d | H. Okonjo |
| Torque wrench calibration20 Apr | TW-221 | Plant 1 · Assembly | 20 Apr | open · 9d | J. Park |
| Notified-body surveillance6 Jun | Organisation-wide | All sites | 6 Jun | open · 56d | Quality |
| Cleanroom classification2 May | Clean room CR-A | Plant 1 · Clean room | 2 May | open · 21d | R. Mensah |
| Forklift operator ticket10 Apr | Forklift FL-06 | Plant 2 · Yard | 10 Apr | 1d overdue | A. Silva |
| Balance verification8 May | Analytical balance AB-2 | Plant 1 · Metrology | 8 May | in 27d | J. Park |
Bring us your automotive parts spreadsheet.
The first session is the import: a column mapper, a dry run that shows exactly what will be created, a per-row error report numbered to match your file, and an undo for the whole batch in one action. Getting five hundred rows in on day one is the point, not a later project.
- Programme
- Pilot
- Places
- Limited
- Reply
- Every enquiry
Tell us your sector and roughly how many assets you track. We reply to every one.