Skip to content

Aerospace & defense manufacturing

Machine tools, CMMs and torque tools on a calibration interval, with the quality-system certifications, export authorisations and NDT operator certifications behind every part that ships.

Ships today as the aerospace pack, version 1AS9100 · NADCAP

Document type
Industry pack
Document
ACT-WEB

What the pack gives you on day one.

Machine tools, gauges and test rigs under AS9100 and NADCAP, with the quality-system certifications, export authorisations, operator certifications and tool calibrations that lapse on a calendar date. Everything below is seeded into your organisation when you adopt the pack, and every row of it is yours from that moment: rename it, reorder it, delete it, add to it. Upgrading the pack later never overwrites something you have edited.

Assets you put in the register

Machine tool
CNC mills, lathes and grinders cutting flight hardware.
Coordinate measuring machine
CMMs and scanners whose results accept or reject a part.
Torque tool
Wrenches and drivers with a certified setting, individually serialised.
Test rig
Pressure, vibration, environmental and functional test stands.
NDT equipment
Penetrant lines, ultrasonic, eddy current and radiographic equipment.
Heat treatment
Furnaces and quench systems under pyrometry survey.
Tooling & fixture
Jigs, fixtures and moulds on a periodic reverification.
Reference standard
Gauge blocks, masters and artefacts that calibrate everything else.

Fields your sector needs

Not hardcoded into the product for everyone — defined by the pack, validated on every write, and filterable and exportable like any built-in field.

Export controlledYes / no
Subject to ITAR, EAR or a national control, so who may stand in front of it is restricted.
Calibration interval (months)Whole number
The interval the calibration schedule works to. Shortening it after a failure is the usual response.
Measurement traceabilityOne of a list
How this instrument's accuracy traces back to a national standard.
National standard (UKAS/NIST or equivalent) · Internal reference standard · Manufacturer certificate · Not traceable — indication only
Special processAny of a list
NADCAP special processes this equipment is accredited for.
Heat treating · Nondestructive testing · Welding · Chemical processing · Coatings · Composites · Measurement & inspection
Accepts productYes / no
Its reading decides whether a part ships. These are the assets whose calibration lapse triggers a recall review.

Your words, not ours

No screen in the product hardcodes a noun. The pack renames these, and the rest keep the neutral word.

  • entitlementCertifications
  • maintenance_planCalibration schedules
  • service_eventCalibration records
  • locationCells

What expires, and how early you hear about it.

These are the real warning ladders, not an illustration. Each one is set from how long that renewal actually takes — a certificate an authority re-inspects opens months ahead, because a thirty-day reminder would already be too late. The first rung is when the work has to start; a final 1 means it stops work the day it lapses.

Certifications the Aerospace & defence manufacturing pack seeds, with their default warning thresholds
CertificationWhy it is on the ladderWarns at
Quality system certificateAS9100 and equivalent scheme certificates. The surveillance audit is booked long before the end date.2701809030days before
NADCAP accreditationSpecial-process accreditation, granted per process and per site.2701809030days before
Export authorisationITAR, EAR or national licence covering a part, a technology or a person's access to it.180903071days before
NDT operator certificationHeld by a person, at a level. A lapsed level 2 invalidates the inspections signed after it.180903071days before
Calibration certificateThe single most common obligation on this register, and the one an auditor samples first.603071days before
Pyrometry surveyTUS and SAT under AMS2750 — each furnace, each qualified range.903071days before
Customer approvalA prime's approval of a process, a part or a source. Losing it is losing the work.1809030days before
Tooling reverification—90307days before
Facility security clearance—1809030days before
Operator certificationWelding, composite and special-process operators, each with an expiring qualification.12060307days before

Held against

Tag an obligation with the standard it satisfies, and the coverage report counts them — including the ones mapped to no framework at all, which is the number an auditor asks about.

  • AS9100D · SAE / IAQG
  • AS9102 first article inspection · SAE / IAQG
  • NADCAP · PRI
  • AMS2750 pyrometry · SAE
  • ITAR · US Department of State
  • EAR · US Department of Commerce
  • ISO/IEC 17025 · ISO / IEC

Views already drawn

Filters your sector asks for weekly, waiting above the register on the first day. They are ordinary saved views: change the columns, delete the ones you do not want, save your own.

  • Product acceptance equipment
  • Export controlled
  • Measurement & inspection
  • Special process equipment

The question the inspection opens on.

“This inspection was signed by a level 2 — was their certification in date?”

— what an auditor in this sector asks first

The auditor export answers it in one action: the asset, every obligation on it, every plan, every service event, every filed document and the full change history — assembled in a single consistent read, so no two sections of the file can disagree. Two exports of an unchanged record are byte-for-byte identical.

  • Append-only history. Every change lands in an event log in the same transaction as the change. No role holds an update or delete grant on that table.

  • Certificates listed, with their evidence. Documents filed against the obligations and the service events are in the export too — the calibration certificate lives on the service event, and that is the one you will be asked for.

  • Readable by everyone on the team. Quality, finance and an external auditor given a seat can all run it. The people who most need the export are exactly the ones a viewer role would have blocked.

The dashboard on any Monday morning: what has already lapsed, what lapses this week, and what needs starting now to land on time.

Northfield LabsRegisterSample data
Overdue
03
Due this week
02
Next 30 days
06
Renewals to start
06
Failed sends
00
Sample obligations from a fictional organisation, resolved against an observation date the visitor controls. Every row is one record in the register — an obligation, the asset it sits on, and the person accountable for it.
ObligationStatus
Sterilisation validation8 Apr3d overdue
Storage permit15 Aprin 4d
Calibration certificate17 Aprin 6d
ISO 13485 certificate4 Julopen · 84d
Service contract25 Aprcancel in 14d
Pressure vessel inspection3 Apr8d overdue
Radiation source licence12 Mayopen · 31d
Torque wrench calibration20 Apropen · 9d
Notified-body surveillance6 Junopen · 56d
Cleanroom classification2 Mayopen · 21d
Forklift operator ticket10 Apr1d overdue
Balance verification8 Mayin 27d

Bring us your aerospace spreadsheet.

The first session is the import: a column mapper, a dry run that shows exactly what will be created, a per-row error report numbered to match your file, and an undo for the whole batch in one action. Getting five hundred rows in on day one is the point, not a later project.

Programme
Pilot
Places
Limited
Reply
Every enquiry

Tell us your sector and roughly how many assets you track. We reply to every one.